The mayor of the town, Mari Carmen Moreno, and the mayor of Town Planning, Tomás Consentino, recently visited the refurbishment works of the adaptation project on the left bank of the Cañarete ravine as it passed through the Partial Plan SUP CH-2 The Hill II.
As explained after the visit, in the area is proceeding to the removal of the existing mota to run a breakwater of protection with a length of 390 meters and place, later, a cobbled sidewalk and a wooded area that will add a new area of ​​walk to the municipality.
Source: Ayuntamiento de Águilas