Last week, with the reception by the City Council, the works of re-composition of the adaptation project of the left bank of the ravine of Cañarete as it passed through the Partial Plan SUP CH-2 La Loma II ended.
Specifically, it has proceeded to the removal of the existing mota and subsequent execution of a protective jetty with a length of 390 meters, as well as the placement of a cobbled sidewalk and a wooded area that has allowed to add a new walk area to the municipality.
The mayor of Águilas, Mari Carmen Moreno, recently visited this space accompanied by the mayor of Urbanism, Tomás Consentino, and the shopping director of Profusa, Laura Fuertes.
Source: Ayuntamiento de Águilas