The mayor of Agriculture, Bartolo Hernández, has indicated that they have already concluded the work on cleaning the ditches and edges of rural roads in the municipality and that 100 kilometers of paved rural roads have been extended in case. Some works - the mayor pointed out - which basically consist of clearing the brush and vegetation that accumulates on the sides of the rural road network. The gutter clearing and cleaning works have already been carried out in: - Camino del Molino del Saltador. - Way of the sale of San Felipe. - South Pozo Road - Camino de Los Pinos. - Camino de Las Palomas. - Camino de Las Lomas. - Camino de Los Arejos. - Camino de Los Gallegos. - Camino de San Isidro. - Camino de Las Primicias. - Camino de Los Melenchones. - Road to Lo Alcázar. - Camino de Los Zurdos. - Camino de Las Casicas. - Way of the Routes. - Tortosa road. - Watertight path from Tébar to the Escalerica - Cleaning and conditioning of the Aqueduct of La Escalerica. - Road from La Pilica to La Escalerica. - Camino de La Escalerica. - Camino de Los Melenchones. - On the way from the Peñarrubia bar to the roundabout. - Camino de los Puentecicos. - Cañada brusca road. - Camino de los Molinos (Cocón road). - Camino de Los Salinares. - Road from the desalination plant to the Mota farm. - Path of the Huerta del Abad. - Camino de los Puentecicos. - Camino del Pocico al Cantar.
Source: Ayuntamiento de Águilas