Portal de Aguilas

www.portaldeaguilas.com

Aguilas - SpanishAguilas - English
detail of Aguilas

 

The Source Port sports a new look Eagles (15/04/2014)

Councilman Squares and Gardens City of Eagle, Isidro Carrasco, announced today that work on the project of remodeling the Source Port, next to Icarus (monument to Carnival) that began in mid-March and have completed, as planned, to retrieve this facility, located in one of the busiest places for visitors and aquiline and able to enjoy it this Easter.

The work consisted in the creation of several beds, which have been equipped with a polyethylene pipe for installing an automated drip irrigation.

The surface is covered with artificial grass and natural vegetation includes different species.

They have replaced the damaged granite plates lining the hontanar and have repaired the damage to the entire surface.

Similarly, we have installed a new pumping system that allows a great boost water jet in the central region as well as other lower on the sides.

This is undoubtedly one of the most important developments since the device is provided with LED lighting technology with a computer program that enables the water will change color.

This action joins the recent adaptation of a section of 1.100 m2 of pedestrian walking in the same environment where the City of Eagle replaced the existing wooden bridge with a new cobblestone pavement, finally ending the continuing damage that would cause him this way, mainly because of the low resistance showed that the old boards before the passage of pedestrians.

Source: Ayuntamiento de Águilas

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información