The mayor of Eagle, Bartolomé Hernández, and Council and Water Works, Diego Martinez and Isidro Carrasco, respectively, visited this morning the new Pump Station Wastewater (Ebara) that the council has built aquiline urbanization "The Stove "at the confluence of the streets and Andrés Segovia Francisco Salzillo, aside Rail Bridge" Boulevard of Snakes ".
This action will remove the existing Ebara by the Auditorium and Congress Palace "Infanta Elena", which had become obsolete and serious deficiencies in its pumping ability.
The new infrastructure has two impellers, located at an average depth of 9'50 meters below the water table and sea, carrying wastewater from its current location to the intermediate station, located on the ring road towards Calabardina and, once there, they are sent to the sewage treatment plant for treatment.
Also, at the top, this project includes the addition of a large green area, with playground and fitness equipment for adults, and the placement of different street furniture, placing value on an area that lacked any kind of services for the enjoyment of residents.
Similarly, building on this work, new lights were installed in the adjacent streets, Angel Ferrer and Francisco Salzillo latter also benefited from the replacement of sidewalks that were in disrepair, and proceeded to tarmac the road from access to the area and the construction of a new roundabout next to the theater.
Source: Ayuntamiento de Águilas